Legacy system migration as a milestone

Move off an old system or spreadsheet process onto a supported one, as a fixed-scope milestone with acceptance criteria and a rollback plan.

Where it starts

The trigger.

A critical process runs on a system that is unsupported, fragile or understood by one person.

How it runs today

  • The old system breaks in ways only one person can fix.
  • Data lives in formats nothing else can read.
  • Every attempt to replace it stalls on scope.

The workflow

Four bounded steps.

Each step has an owner and a stop rule.

  1. 01 / Define

    Agree what must work on day one, and what can wait.

  2. 02 / Map

    Document the data, integrations and workflows the old system supports.

  3. 03 / Migrate

    Move data and workflows in tested stages, running old and new side by side.

  4. 04 / Cut over

    Switch with a rollback plan, then retire the old system once accepted.

Where people stay in control

Approval points.

  • The process owner signs off each stage against the acceptance criteria.
  • Cut-over happens only with an approved rollback plan.

How we would measure it

Against a baseline.

Measured before and after, on the same work.

Acceptance criteria met at cut-over.

Incidents in the weeks after cut-over.

Manual workarounds removed.

Related

Go deeper.

More use cases

Other places to start.

All use cases

An illustrative workflow pattern, not a result from a specific customer.

Bring the messy version

One workflow.
A better way to run it.

Show us the tools, the handoffs, and the part that keeps slowing your team down.

Explore with AI

What would you like help with?

Get the main points in plain language.

Continue with

Includes this page title and canonical URL. The prompt is copied before the provider opens; supported providers also receive it through the URL.